DOC TDF-02 · FACILITY BRIEFING · REV 3
ALBERTA, CANADA
FACILITY / CAMPUS PROGRAM PLAN · ALIGNED TO GREENFIELD TDF-02
Stony Plain Campus Blueprint
Conceptual program plan · Not for construction · Final design subject to site, code, professional, insurance, municipal, and regulatory review
LAYER CONTROLL1-L5
L1 · OPERATING PROGRAM
L2 · SECURITY & ACCESS
L3 · QUALITY FLOW
L4 · FUTURE RESERVE
L5 · COMMUNITY & APPROVAL BOUNDARY
SELECT A ZONE ON THE PLAN FOR ITS PROGRAM DETAIL
ACTIVE CAMPUS BOUNDARY · CORE PILOT · CONCEPT
P.01
Arrival + partner threshold
MAIN ENTRY SIDE
P.02
Engineering + systems studio
P.03
Additive + fixture lab
P.04
Quality + metrology
P.05
Systems integration bay
STAGE 03
P.06
Workforce + partner studio
P.07
Receiving + traceable stores
DOCK SIDE
P.08
Plant services + utility spine
C.09
Stormwater + grade reserve
E.10
Long-horizon expansion pad
STAGE 03
R.11
Conditional regulated-work reserve
OUTSIDE CAMPUS BOUNDARY
DOCK
MAIN ENTRY
SCALE INDICATIVE ONLY · NO SURVEY BASIS
PROGRAM ZONE
CONTROLLED / CIVIL
PEOPLE / WORKFORCE
FUTURE CONDITIONAL
QUALITY FLOW
APPROVAL BOUNDARY
SELECTED
Conceptual facility visualization · Not a permit set, engineering drawing, or operational authorization
Zone schedule
CAMPUS PROGRAM · TDF-02 ZONES · NO AREAS STATED
REFZONECLASSACCESS PROFILE
P.01Arrival + partner thresholdPeoplePublic entry · staffed hours
P.02Engineering + systems studioProgramStaff
P.03Additive + fixture labProgramControlled · trained staff
P.04Quality + metrologyProgramControlled · trained staff
P.05Systems integration bayProgram · stage 03Controlled · trained staff
P.06Workforce + partner studioPeopleEscorted visitors
P.07Receiving + traceable storesControlledRestricted · logged access
P.08Plant services + utility spineCivil / utilitiesRestricted · named staff
C.09Stormwater + grade reserveCivil / siteworksOutdoor reserve · no occupancy
E.10Long-horizon expansion padCivil · stage 03Held ground · no construction
R.11Conditional regulated-work reserveFuture · gatedNot applicable · no activity this stage